Al Safwan Marine
Get a quote Call +971 55 659 9860

ProjectMarch 27, 2026

Alfa Laval BWTS Troubleshooting – Dubai Maritime City

Photos

Alfa Laval system serviced onboard a deck cargo vessel at Dubai Maritime City (DMC).

Targeted troubleshooting was carried out to resolve control and performance inconsistencies affecting system operation.

  • Key Issues Identified
  • Non-responsive control valve (V201-8)
  • Low/zero flow indication
  • UV reactor alarms with uneven load distribution
  • PLC I/O signal irregularities
  • Actions Executed
  • Verified valve actuation, pneumatic supply, and solenoid manifold
  • Checked PLC signals, wiring integrity, and communication stability
  • Inspected UV reactor performance and LPS output balance
  • Validated CIP sequence and system interlocks

Outcome

  • Restored flow, valve response, and system stability
  • Balanced UV reactor performance
  • Accurate HMI feedback and control restored
  • System ready for compliant ballast operations

Precision troubleshooting ensures reliability, compliance, and uninterrupted vessel operations.

More projects

All projects
Get a quote WhatsApp

24/7 support

Vessel due for survey, inspection or repair? Our technicians attend at every major UAE port and anchorage, around the clock.

  • Class-approved service station IACS
  • Quality management ISO 9001
  • Lifeboat flag-state provider Panama
  • Attendance 24/7