Al Safwan Marine
Get a quote Call +971 55 659 9860

ProjectJuly 23, 2026

Five-Yearly Inspection of Rescue Boat, Davit & Winch – DMC

Photos

A rescue boat is more than equipment—it's a critical lifeline when every second matters.

That's why our team was proud to successfully complete the Five-Yearly Inspection of the Rescue Boat, Davit & Winch System onboard DMC.

Work Completed

  • Rescue Boat Inspection
  • Davit & Winch System Inspection
  • Functional & Operational Testing
  • Load Testing & Performance Verification
  • Compliance Inspection

Every inspection is carried out with one goal in mind: ensuring lifesaving equipment performs exactly as intended when it's needed most.

Thank you to our client for trusting Al Safwan Marine with this important milestone.

More projects

All projects

Engine Room Bilge Tank High-Level Alarm System Service | Suez Port, Egypt

Al Safwan Marine successfully completed the troubleshooting, testing, and functional verification of the Engine Room Bilge Tank High-Level Alarm System onboard a vessel at Suez Port, Egypt. The project ensured reliable alarm performance, enhanced safety, and compliance with operational requirements.

Get a quote WhatsApp

24/7 support

Vessel due for survey, inspection or repair? Our technicians attend at every major UAE port and anchorage, around the clock.

  • Class-approved service station IACS
  • Quality management ISO 9001
  • Lifeboat flag-state provider Panama
  • Attendance 24/7