Al Safwan Marine
Get a quote Call +971 55 659 9860

ProjectMarch 02, 2026

Shipboard Crane Load Test & Inspection – Fujairah Anchorage

Photos

  • Fujairah Anchorage, UAE

Precision. Procedure. Performance.

As part of routine marine lifting assurance, comprehensive load testing and detailed inspection were successfully completed onboard at Fujairah Anchorage.

Here’s a snapshot of the testing carried out

  • Midship Crane

SWL: 2.04 Tons

Test Load Applied: 2.55 Tons

  • Provision Crane

SWL: 0.97 Ton

Test Load Applied: 1.21 Tons

  • Engine Room Overhead Crane

SWL: 1 Ton

Test Load Applied: 1.25 Tons (Static Pull Test)

Before Load Application

  • Detailed visual inspection
  • Structural assessment
  • Brake & safety device checks
  • Functional operational testing

Testing Focus

  • Structural integrity
  • Braking performance
  • Operational reliability

All inspection and testing procedures were carried out in accordance with Lifting Equipment Engineers Association (LEEA) standards.

Result

All cranes were found satisfactory and are safe for continued operation within their respective SWL limits.

Because at sea, lifting safety isn’t optional — it’s operational discipline.

More projects

All projects

Engine Room Bilge Tank High-Level Alarm System Service | Suez Port, Egypt

Al Safwan Marine successfully completed the troubleshooting, testing, and functional verification of the Engine Room Bilge Tank High-Level Alarm System onboard a vessel at Suez Port, Egypt. The project ensured reliable alarm performance, enhanced safety, and compliance with operational requirements.

Get a quote WhatsApp

24/7 support

Vessel due for survey, inspection or repair? Our technicians attend at every major UAE port and anchorage, around the clock.

  • Class-approved service station IACS
  • Quality management ISO 9001
  • Lifeboat flag-state provider Panama
  • Attendance 24/7