Al Safwan Marine
Get a quote Call +971 55 659 9860

ProjectSeptember 10, 2026

Bollard Pull Test Successfully Completed

Photos

Verifying a vessel's towing capability is essential for ensuring safe and reliable marine operations. Our team successfully completed a Bollard Pull Test, confirming the vessel's performance under controlled conditions.

Key Highlights

  • Verified maximum static towing capacity
  • Assessed propulsion system performance
  • Confirmed operational readiness
  • Conducted using industry best practices
  • Delivered accurate and reliable test results

At Al Safwan Marine, we are committed to providing professional marine testing and inspection services that support safety, compliance, and operational excellence.

More projects

All projects

Engine Room Bilge Tank High-Level Alarm System Service | Suez Port, Egypt

Al Safwan Marine successfully completed the troubleshooting, testing, and functional verification of the Engine Room Bilge Tank High-Level Alarm System onboard a vessel at Suez Port, Egypt. The project ensured reliable alarm performance, enhanced safety, and compliance with operational requirements.

Get a quote WhatsApp

24/7 support

Vessel due for survey, inspection or repair? Our technicians attend at every major UAE port and anchorage, around the clock.

  • Class-approved service station IACS
  • Quality management ISO 9001
  • Lifeboat flag-state provider Panama
  • Attendance 24/7