Al Safwan Marine
Get a quote Call +971 55 659 9860

ProjectSeptember 12, 2026

Harken Access Rail System โ€“ Pull-Out Testing | Yacht

Photos

We are pleased to share the successful completion of Pull-Out Testing for the Harken Access Rail System onboard a yacht at Yas Marina, Abu Dhabi, UAE. The testing was carried out to verify the integrity and performance of the fall protection anchorage system in accordance with applicable testing standards.

Project Scope

  • System: Harken Access Rail System
  • Test Load: 250 kg SWL
  • Method: Pull-Out / Anchorage Testing
  • Equipment: Calibrated Pull-Testing Instrument

Testing Locations

โœฆ Sundeck

โœฆ Bow / Monkey Island

โœฆ Main Deck

โœฆ Pilot Ladder Pad Eyes

All tested anchorage points successfully met the required performance criteria, confirming the system's reliability for fall protection applications.

Alsafwan Marine โ€“ Delivering trusted inspection, testing, and certification services with a commitment to safety, quality, and engineering excellence.

More projects

All projects
Get a quote WhatsApp

24/7 support

Vessel due for survey, inspection or repair? Our technicians attend at every major UAE port and anchorage, around the clock.

  • Class-approved service station IACS
  • Quality management ISO 9001
  • Lifeboat flag-state provider Panama
  • Attendance 24/7