Al Safwan Marine
Get a quote Call +971 55 659 9860

ProjectApril 01, 2026

Crane Hoisting & Luffing Pump Gearbox Seal Renewal – Abu Dhabi

Photos

At Blue Gulf Port, Abu Dhabi, a critical maintenance operation was successfully carried out on the crane’s hydraulic drive system.

Scope Of Work

  • Dismantling of hoisting & luffing pump assembly
  • Inspection of splitter gearbox internal components
  • Seal removal and precision surface cleaning
  • Renewal of worn oil seals and sealing interfaces
  • Technical Observations
  • Signs of oil leakage due to seal wear and ageing
  • Gear and spline condition verified — no abnormal wear
  • Bearing seating and mating surfaces checked for integrity
  • Execution Highlights
  • Controlled dismantling to avoid shaft/spline damage
  • Proper alignment during reassembly
  • Seal installation with correct tolerances and lubrication
  • Pressure verification carried out post-installation

Outcome

  • Leakage eliminated
  • Restored hydraulic efficiency
  • Improved system reliability under load conditions

In heavy-duty crane operations, small seal failures can lead to major performance losses — timely intervention ensures operational continuity and safety.

Precision Maintenance. Reliable Performance. Assured Operations.

More projects

All projects
Get a quote WhatsApp

24/7 support

Vessel due for survey, inspection or repair? Our technicians attend at every major UAE port and anchorage, around the clock.

  • Class-approved service station IACS
  • Quality management ISO 9001
  • Lifeboat flag-state provider Panama
  • Attendance 24/7