ProjectApril 08, 2026
Power Pack Unit Service – Concrete Plant, Jebel Ali
Job Overview
We got a call from a concrete mix production plant in Jebel Ali, reporting a downgraded performance in the Hydraulic Power Unit. Our team visited the plant a detailed inspection of the Power Pack Unit was done and identified performance issues affecting system reliability and efficiency.
Work Carried Out
- Directional Control Valves Replacement
Both DC valves were found with internal leakage, leading to inefficient flow control.
- Removed defective units
- Installed new valves for precise and reliable operation
- Oil Level Gauge Replacement
The existing gauge was damaged and inaccurate.
- Removed faulty gauge
- Installed new oil level indicator for proper monitoring
- Hydraulic Tank Cleaning
Contamination was observed inside the tank.
- Fully drained hydraulic oil
- Thorough internal cleaning carried out to remove sludge and particles
- Filter Maintenance
- Filters were removed and cleaned carefully
- Ensured proper oil flow and contamination control
Result
The system is now operating with
- Leak-Free Performance
- Improved Efficiency
- Enhanced System Cleanliness
- Reliable Monitoring & Operation