Al Safwan Marine
Get a quote Call +971 55 659 9860

ProjectFebruary 23, 2026

Yacht Deck Crane Load Test & Wire Rope Renewal – Port Rashid

Photos

A statutory deck crane load test was successfully carried out at Port Rashid, Dubai, following the renewal of the crane wire rope, ensuring continued operational safety and compliance.

Test Configurations

  • MOB (Man Overboard) Mode: SWL 750 Kg
  • Cargo Mode: SWL 2000 Kg
  • Static Load Test: 2500 Kg

Following wire rope replacement, the crane was subjected to detailed operational and load testing to confirm

  • Structural integrity
  • Lifting efficiency under rated loads
  • Compliance with statutory and safety requirements

The load test was completed successfully, and the crane was certified to be in safe working condition, ready for continued marine operations.

Standards & Compliance

All inspection and testing procedures were executed in accordance with LEEA standards, ensuring reliability, safety, and regulatory assurance.

More projects

All projects
Get a quote WhatsApp

24/7 support

Vessel due for survey, inspection or repair? Our technicians attend at every major UAE port and anchorage, around the clock.

  • Class-approved service station IACS
  • Quality management ISO 9001
  • Lifeboat flag-state provider Panama
  • Attendance 24/7