Navigation, radio and VDR Lesson 2 of / 7
Sign in

Lesson 2 · 15 min

The VDR annual performance test, step by step

You will know exactly what happens in a VDR annual performance test, who may do it, when it is due and what the certificate of compliance must show.

3D simulatorQuizRules checked 20 October 2026

Start here

The 2-minute primer

New to this? These 6 cards explain the lesson in plain words. Go through them first and the lesson will make sense.

  1. 1/6Picture this

    A black box needs checking too

    An aircraft’s black box records the flight so investigators can learn what went wrong. It is no use if a sensor has been feeding it rubbish for months.

    A ship has its own black box, the voyage data recorder. Once a year someone checks that it really records everything it should.

  2. 2/6The big idea

    Prove every input reaches the recorder

    The recorder captures position, speed, heading, the radar picture, bridge voices, radio calls, engine and rudder orders and alarms. It stores them in tough capsules, one of which floats free on newer ships.

    Sensors fail quietly. So once a year an approved technician cuts the power to test the backup battery. They test the locator beacon, check the capsules and record 12 hours of data for the maker to analyse.

  3. 3/6Words you'll meet

    Six words, in plain English

    VDR
    voyage data recorder, the ship’s black box that records what happens on the bridge.
    Capsule
    the tough protective box that holds the recorded data, built to survive fire, impact and deep water.
    Float-free capsule
    a capsule that breaks loose and floats up if the ship sinks, then sends a signal.
    Acoustic beacon
    a small underwater device on the capsule that sends a homing sound so searchers can find it.
    Reserve power
    the backup battery that keeps the recorder running for about two hours after a power cut.
    Certificate of compliance
    the paper from the testing company, kept on board, proving the yearly test was passed.
  4. 4/6Why it matters

    When the worst happens, the data must be there

    After the cargo ship El Faro sank, her recorder let investigators rebuild the last day on the bridge. It also showed a broken wind sensor had been recording wrong data.

    A missing certificate, or a recorder that doesn’t record everything, can bring a deficiency or detention in port.

  5. 5/6In this lesson

    What you’ll be able to do

    • Follow the yearly test step by step on board.
    • Know who is allowed to carry out the test.
    • Know when the test is due and how the certificate arrives.
    • Spot the gaps that inspectors find, like dead sensors and old batteries.
  6. 6/6Quick check

    What does the yearly test mainly prove?

Skip to the lesson

A tanker's wheelhouse cut open: radar and ECDIS consoles, the GMDSS station, the VDR, and the compass deck with the magnetic compass and antennas

The basics

On 1 October 2015 the cargo ship El Faro sailed into Hurricane Joaquin and sank with all 33 people on board. Ten months later a US Navy remotely operated vehicle lifted her VDR capsule from 15,250 feet below the surface. It held more than 26 hours of bridge audio from six microphones, radar images and ship’s data, and it let the National Transportation Safety Board reconstruct the last day on the bridge minute by minute. It also exposed a sensor fault that had gone unrepaired: the officers had remarked that the anemometer was not working, and the wind data the VDR had recorded were wrong.

That is what the VDR annual performance test is for: once a year an approved technician proves that every required input reaches the recorder, that recording survives a power loss, that the capsules can be found and the data read back. A sensor that has been dead for months should be caught here. This lesson walks through the test as it happens on board.

Sign in to read the rest of this lesson

Continue reading

Save your progress, open all 115 lessons and get a Course completed card when you finish.

We'll email you a 6-digit code. No password. Already signed up? Same box.

By continuing you agree to our Privacy policy.

In the rest of this lesson

  • Try it: A VDR annual performance test from planning to certificate
  • In plain words
  • In detail
  • What the rules say
  • Flag and class notes
  • Key numbers
  • What inspectors find
  • 3 questions people ask
  • Quiz: 6 questions
  • Ask our engineers about this lesson

This lesson cites 11 sources, listed in full once the lesson is open.

Familiarisation training from Al Safwan Academy. Finishing a course shows completion of online familiarisation training: it is not an STCW, flag-approved or manufacturer qualification, and these courses don't replace that training. The manufacturer's manual and your flag's rules always come first.